LAS LOMAS, Monterey County — October 30, 2026. Las Lomas remains a focus of long-range transportation safety planning because regional drivers on Hall Road (County Route G12) share narrow roads with local residents, school families and agricultural traffic. The Pajaro-to-Prunedale G12 corridor study outlines possible intersection changes and pedestrian routes in the community, while the county's draft 2026–31 capital program says additional design and environmental funding still needs to be found.

What changes have been studied?

The Transportation Agency for Monterey County identifies the Las Lomas section as Project Area 3, Hall Road between San Miguel Canyon Road and Elkhorn Road. Concepts include changing the Hall Road/Sill Road intersection into a roundabout or traffic signal, combining some side-road intersections, making left turns safer, adding sidewalk connections, and improving the Hall Road approach at San Miguel Canyon Road.

Why is the Hall Road corridor important?

The study describes a north-south alternative to larger highways for commuters while residents use the same streets to reach Hall District Elementary School, local shops and homes. For the wider G12 corridor, the transportation agency reported 832 collisions between 2012 and 2018, including 11 fatalities and 27 bicycle- or pedestrian-involved crashes. These figures are for the entire G12 corridor and an older study period, not a claim that 832 crashes occurred within Las Lomas or in 2026.

Has the roundabout been built or funded?

The county's draft 2026–27 through 2030–31 capital improvement plan listed approximately $1,951,375 of design and environmental work as unfunded for Project Area 3 and directed staff to continue seeking funding. Draft planning is not a construction award, a scheduled road closure or a final selected engineering design. The detailed 2019 corridor study presents options that may change before any future construction.

Is this the same as Las Lomas Drive sidewalk work?

No. The community has a separate Las Lomas Drive Bicycle Lane and Pedestrian Project, for which California58 previously reported a $3.47 million county construction contract. This story covers the broader Hall Road and Sill Road G12 corridor alternatives and their funding gaps, not a second contract for the existing sidewalk project.

Official sources: Transportation Agency for Monterey County — G12 corridor study and Las Lomas Project Area 3; Monterey County — corridor safety priorities and proposed Hall Road improvements; County draft FY2026–31 capital plan, G12 Project Area 3 funding entry.

Editor's note: Funding and alignment concepts are planning-stage information. No new roundabout completion, exact start date or current traffic restriction is asserted.

Help Las Lomas News grow Help strengthen reporting on Las Lomas: community voices, important decisions and local life.
Support Las Lomas News

Choose how to support Las Lomas News:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Las Lomas News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

Las Lomas News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Las Lomas News newsroom →

More from Las Lomas News

Visit Las Lomas News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.